Research Article

A Successful Three-Phase Metaheuristic for the Shift Minimization Personal Task Scheduling Problem

Table 5

The detailed results of nine solution methods for KEB, SWMB, and FL instances.


The authors provided the detailed results. Green color indicates that the optimum value was reached. Red color denotes the difference to the optimum value (or to the lower bound). White color indicates that results have not been published.