Research Article
Optimal Operation of the Hybrid Electricity Generation System Using Multiverse Optimization Algorithm
Table 2
Case Study A: demand for 15000 megawatt, where
represent the collection of sources operating on 8 fuel types.
| | Firefly | BAT | GOA | IMVO |
| Price in PKR | 390.831986 | 252.289853 | 201.3324084 | 111.5048004 | Variable (MW) | 15017.4015 | 15006.4398 | 15002.26667 | 15067.46055 | | 4035.19978 | 2893.04991 | 3513.562502 | 4785.656 | | 1407.73428 | 1873.28453 | 1072.160605 | 1338.551 | | 981.013264 | 158.209497 | 62.4800805 | 431.9034 | | 1137.47918 | 567.079361 | 395.4767659 | 1476.913 | | 5684.88097 | 8502.04227 | 8812.308041 | 5366.239 | | 921.438836 | 523.099019 | 684.1945259 | 1180.03 | | 393.294457 | 21.8122192 | 442.1898083 | 150.7902 | | 456.360696 | 467.863004 | 19.8943367 | 337.3776 |
|
|