Research Article

Predicting Slurry Pressure Balance with a Long Short-Term Memory Recurrent Neural Network in Difficult Ground Condition

Table 2

LSTM-based deep learning model performance in the different construction periods.

Construction periodTime ratio (%)MAPE (%)RMSE (kPa)

Excavation27.74.0512.9
Stoppage72.33.749.3
Total1003.8310.3