| Reference | Country, region | Type of rail | Lifespan (years) | Function unit | Data | Life cycle stages |
| [9] | USA | Railway, RTS, subway, and HSR | Varying | PMT and VMT | Sectors and literature | Vehicle (manufacture, operation, maintenance, insurance); infrastructure (construction, operation, maintenance); fuel consumption | [10] | USA | Railway, metro, CR, and LRT | — | PKT | Literature | Train manufacturing, train maintenance, station construction, track construction, station operation, station maintenance, electricity generation supply chains | [11] | USA, California | HSR | — | PKT | SimaPro | Vehicle, station, energy production | [12] | USA, California | HSR | 20 | PKT | Literature | Vehicle, infrastructure, energy production | [13] | Turkey | HSR and railway | 40 | PKM | SimaPro 7.3.3 | Infrastructure (production of electrical energy, construction of lines, maintenance of lines, operation of lines, waste disposal); operation (production of electrical energy, production of train vehicles, maintenance of train vehicles, operation of train vehicles, waste disposal) | [14] | Italy, Rome | Metro | 30 | VKT | Operators and GaBi | Material acquisition, manufacturing, use, and end-of-life | [15] | China | HSR | 20 | SKM | Chinese Core Life Cycle Database (CLCD) and ecoinvent | Vehicle operation, vehicle manufacturing/maintenance/disposal, infrastructure construction | [16] | USA, New Jersey | Commuter | — | 1 mile | Literature | Material manufacturing | [17] | Brazil, Rio de Janeiro | Metro | 60 | | IPCC 2006 | Infrastructure construction, train manufacture, maintenance, infrastructure operation, and train operation | [18] | Portugal | HSR | 35 | PKT | SimaPro and ecoinvent | Material, manufacturing, use, disposal | [19] | Austria, Vienna | Subway | 100 | PKT | Biding documents and GEMIS 4.5 | Infrastructure construction, infrastructure operation | [20] | Spain, Bueno | HSR | 60 | PKM/year, TKM/year | Literature | Infrastructure construction, infrastructure maintenance, operation, 60 years | [21] | Canada, Toronto | Subway | 8 (construction time) | Year | Literature, construction data | Infrastructure construction, operation | [22] | China, Shanghai | Metro | 50 | 1 km | Observed data | Materials production, materials transportation, on-site construction, operation, and maintenance, 50 years, 1 km, PKT, VKT | [23] | India, Mumbai | Railway | 25 | PKT, VKT | Department data | Manufacturing, maintenance and operation, infrastructure construction, infrastructure maintenance | [24] | State of Qatar, Doha | Metro | — | 1000 PKT | Company data and GaBi 6.0 | Train operations, train stations operation | [25] | Turkey | Railway | — | TKM | SimaPro and ecoinvent | | [26] | China, Shanghai | HSR | 100 | - | Literature | Conception stage, construction stage, operation and maintenance stage, and disposal stage | [27] | China | HSR | 100 | T/km T/vehicle | IO-LCA hybrid | Material production, construction | [28] | France | HSR | 120 | Travel of up to 17 metric tons per axle | Experts and ecoinvent 3.1 | Production, maintenance, end-of-life | [29] | Belgium | Railway | 6 | TKM | Country-specific data and ecoinvent | Transport operation, rail equipment, and infrastructure | [30] | China, Fuzhou | Subway | Construction time | Km | In-service lines, regional database (IKE) | Infrastructure construction | [31] | Spain | HSR | 100 | Year | Google Earth | Construction, maintenance, one-year operation | [32] | USA, Houston | HSR | 60 | PKT | Ecoinvent | Raw material extraction and processing, vehicle manufacturing, material distribution, construction, operation and maintenance, and end-of-life | VKT | [33] | Turkey, Kayseri | LRT | 50 | PKM | Company, SimaPro, and ecoinvent | Extraction and production of raw materials, transportation of the raw materials to construction sites, vehicle manufacture, transportation of vehicles, construction of infrastructure, operation, maintenance, and waste disposal |
|
|