Carbon emissions produced during on-site construction.

Working activitiesItemConstruction machineEnergyEnergy consumptionCarbon emissions (t)

FoundationEarth excavationCrawler type mechanical single bucket excavator within 1.0 m³Diesel1,209.33 kg4.44
Stone excavationCrawler type mechanical single bucket excavator within 1.0 m³Diesel766.86 kg2.81
Motorized air compressor within 9 m3/minElectricity1,433.42 kWh1.66
Impact drilling pileCrawler type mechanical single bucket excavator within 1.0 m³Diesel114.23 kg0.42
Trucks within 10 tDiesel310.87 kg1.14
Truck crane within 16 tDiesel278.41 kg1.02
JK8 percussion drillElectricity10,157.69 kWh13.10
Mud separatorElectricity74.55 kWh0.10
Mud mixerElectricity434.89 kWh0.56
Mud pump within Φ 100 mmElectricity1,275.30 kWh1.65
AC arc welder within 42 kV AElectricity331.52 kWh0.43
Manual digging pileSingle barrel slow winch within 50 kNElectricity15,087.19 kWh19.46

Bridge substructureConcreteConcrete delivery pump within 60 m3/hElectricity18,372.52 kWh23.70
Truck crane within 25 tDiesel2,868.75 kg10.53
SteelTruck crane within 25 tDiesel2,562.28 kg9.40
Automatic steel seam welderElectricity4,148.22 kWh5.35
AC arc welder within 32 kV AElectricity9,809.58 kWh12.65
BearingTruck crane within 20 tDiesel206.96 kg0.21
AC arc welder within 32 kV AElectricity178.36 kWh0.23

Bridge superstructureConcreteConcrete delivery pump within 60 m3/hElectricity43,544.45 kWh56.17
Truck crane within 25 tDiesel40,285.13 kg147.85
Cast-in-place T-beam reinforcementAC arc welder within 32 kV AElectricity44,693.70 kWh57.66
AC butt welder within 150 kV AElectricity20,485.11 kWh26.43
Centralized and standardized processing of rebarCNC vertical rebar bending centerElectricity711.17 kWh0.92
AC arc welder within 32 kV AElectricity44,693.70 kWh57.66
AC butt welder within 150 kV AElectricity20,485.11 kWh26.43
Prestressed concreteConcrete delivery pump within 60 m3/hElectricity98,556.12 kWh127.14
Single-cylinder slow-motion winch within 30 kNElectricity2,681,021.27 kWh3,458.52
Single-cylinder slow-motion winch within 50 kNElectricity934,667.96 kWh1,205.72
Φ100 mm electric multistage water pump (≤120 m)Electricity204,479.87 kWh263.78
AC arc welder within 32 kV AElectricity51,668.13 kWh66.65
Steel strandPrestressed steel tensile machineElectricity2,284.49 kWh2.95
Bellows rolling machineElectricity571.23 kWh0.74
Prestressed reinforcementPrestressed stretching machine within 900 kNElectricity6980.95 kWh9.01
Bellows rolling machineElectricity621.10 kWh0.80
Single-cylinder slow-motion winch within 50 kNElectricity6,607.41 kWh6.61

Other installationOptical cable layingTrucks within 10 tDiesel134.38 kg0.49
Engine-driven air compressor within 17 m3/minElectricity46.36 kWh0.06
Electric cable layingTrucks within 10 tDiesel33.58 kg0.12
Truck crane within 5 tDiesel9.95 kg0.04