Research Article
Modeling Limited-Stop Bus Corridor Services with Fare Payment Mode Choice and Trip Purpose Consideration
Table 3
Values of objective function (OF) with different settings.
| Items | Neither capacity constraints nor dwell time | With capacity constraints but without dwell time | Without capacity constraints but with dwell time | With capacity constraints and dwell time |
| OF value ($/min) | 106.0 | 109.1 | 122.9 | 124.1 | % Rise in OF | ā | 3% | 16% | 17% | Total operator cost | 13.4 | 18.7 | 20.4 | 20.8 | Fleet size (no. of buses) | 76 | 106 | 121 | 124 | Frequencies (buses/h) | 159 | 200 | 200 | 200 | Total cost to the passengers | 92.6 | 90.4 | 102.5 | 103.3 | Waiting time cost | 13.5 | 10.3 | 9.4 | 9.7 | In-vehicle time cost | 79.1 | 80.0 | 92.9 | 93.2 | Transfer penalty cost | 0.0 | 0.1 | 0.2 | 0.4 |
|
|