Research Article
Entropy-Based Fuzzy TOPSIS Method for Investment Decision Optimization of Large-Scale Projects
Table 3
Calculation results of the relative closeness obtained from the four methods.
| Methods | P1 | P2 | P3 | P4 | P5 | P6 | P7 | P8 | P9 | P10 |
| VEWF-TOPSIS | 0.348 | 0.044 | 0.822 | 0.683 | 0.331 | 0.688 | 0.769 | 0.377 | 0.328 | 0.769 | EILIF-TOPSIS | 0.150 | 0.430 | 0.359 | 0.704 | 0.424 | 0.755 | 0.397 | 0.216 | 0.671 | 0.167 | IEAI-IF-TOPSIS | 0.586 | 0.243 | 0.736 | 0.442 | 0.270 | 0.888 | 0.809 | 0.790 | 0.439 | 0.862 | Synthesis method | 0.262 | 0.442 | 0.395 | 0.020 | 0.197 | 0.990 | 0.755 | 0.949 | 0.834 | 0.391 |
|
|