| | The main project | Project indicators |
| At the first crossing | The crossroads | There are all kinds of tall buildings, all kinds of road signs, trees, guardrails on both sides of the road, streets, sidewalks, buildings all over very dense, and 8 buildings | | Number of vehicles | Each driving direction has two or three vehicles and a total of 10 vehicles | | The speed of the car | 20 km/h | | Number of passengers | On both sides of the crossing and about 5 people are on each side | | Distractors | Vehicles (cars or buses, or electric cars, or tricycles), pedestrians, and road signs | | Sound | The sound of car sirens and the noise of people going and going | | Other interference | Two crossings |
| At the second crossing | The crossroads | There are all kinds of tall buildings, all kinds of road signs, trees, guardrails on both sides of the road, streets, sidewalks, very dense buildings, and 12 buildings | | Number of vehicles | Each driving direction has four vehicles and a total of 16 vehicles | | The speed of the car | 25 km/h | | Number of passengers | On both sides of the crossing and about 5-6 people are on each side | | Distractors | Vehicles (cars or buses, or electric cars, or tricycles), pedestrians, and road signs | | Sound | The sound of car sirens and the noise of people going and going |
|
|