Research Article
Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability
Table 1
The machine Alba 26/polyethylene manufacturer.
| 2.3438 | 9.9792 | 8.25 | 3.8854 | 1.9583 | 9.6042 | 6.3958 | 5.5625 | 7.7708 |
| 0.8333 | 11.9375 | 5.9167 | 10.9375 | 3.0625 | 4.2083 | 6.8333 | 6.8854 | 6.2083 | 12.0104 | 8.9167 | 8.3125 | 0.4167 | 2.875 | 6.1875 | 6.5313 | 9.7708 | 1.2917 | 10.0625 | 3.375 | 6.7917 | 1.6042 | | | | | |
|
|