Research Article

Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability

Table 2

The machine Crupp 21/injection and blowing manufacturer.

5.39582.07295.1259.833319.16672.010413.156311.979218.6354

13.42714.69799.45832.29174.062511.333312.229218.79174.6667
11.56252.833310.85420.437516.260412.20835.21886.59384.2083