Research Article
Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability
Table 2
The machine Crupp 21/injection and blowing manufacturer.
| 5.3958 | 2.0729 | 5.125 | 9.8333 | 19.1667 | 2.0104 | 13.1563 | 11.9792 | 18.6354 |
| 13.4271 | 4.6979 | 9.4583 | 2.2917 | 4.0625 | 11.3333 | 12.2292 | 18.7917 | 4.6667 | 11.5625 | 2.8333 | 10.8542 | 0.4375 | 16.2604 | 12.2083 | 5.2188 | 6.5938 | 4.2083 |
|
|