Table 3
Determining the optimal period for conducting preventive maintenance operations and total downtime D (K).
| | Machine Alba 26 | Machine Crupp 21 | | | | | |
| 1 | 0.0286 | 0.0898 | 0.0265 | 0.0895 | 2 | 0.1035 | 0.0525 | 0.0804 | 0.0508 | 3 | 0.2218 | 0.0415 | 0.1554 | 0.0382 | 4 | 0.3856 | 0.0376 | 0.2503 | 0.0325 | 5 | 0.5992 | 0.0368 | 0.3652 | 0.0296 | 6 | 0.8694 | 0.0377 | 0.5012 | 0.0282 | 7 | 1.2052 | 0.0398 | 0.6599 | 0.0278 | 8 | 1.6182 | 0.0428 | 0.8434 | 0.0279 | 9 | 2.1224 | 0.0468 | 1.0543 | 0.0284 | 10 | 2.7355 | 0.0516 | 1.2956 | 0.0293 | 11 | 3.4787 | 0.0574 | 1.5707 | 0.0306 | 12 | 4.3780 | 0.0643 | 1.8838 | 0.0321 | 13 | 5.4649 | 0.0724 | 2.2396 | 0.0339 | 14 | 6.7774 | 0.0818 | 2.6433 | 0.0360 | 15 | 8.3612 | 0.0928 | 3.1009 | 0.0383 | 16 | 10.3093 | 0.1059 | 3.6303 | 0.0411 | 17 | 12.5770 | 0.1204 | 4.2066 | 0.0439 |
|
|