Research Article
[Retracted] Model Test and Numerical Simulation of Water Conservancy Foundation Bearing Capacity
Table 5
Statistics of construction process parameters and results.
| Number | Hole diameter (mm) | Bag diameter (mm) | Pier length (m) | Cloth bag | Total filler volume (m3) | Filling coefficient | Filling times | Vibration retention time (min) | Vibration retention times | Filler particle size (mm) |
| 1-1 | 800 | 900 | 13.5 | Nothing | 13.0 | 1.37 | 7 | Tamp | — | 5–10 | 1-2 | 800 | 900 | 14 | Nothing | 14.1 | 1.45 | 7 | Tamp | — | 5–10 | 1-3 | 800 | 900 | 13 | Nothing | 13.1 | 1.45 | 8 | 31.4 | 8 | 5–10 | 2-1 | 800 | 900 | 13 | Have | 12.7 | 1.10 | 7 | Tamp | — | 5–10 | 2-2 | 800 | 900 | 13 | Have | 11.1 | 1.23 | 8 | Tamp | — | 5–10 | 2-3 | 800 | 900 | 13 | Have | 12.3 | 1.16 | 7 | 35 | 7 | 5–10 | 3-1 | 1200 | 1200 | 14 | Have | 16.1 | 1.33 | 8 | Tamp | — | 5–10 | 3-2 | 1200 | 1200 | 13 | Have | 14.7 | 1.10 | 8 | Tamp | — | 5–30 | 3-3 | 1200 | 1200 | 13 | Have | 14.8 | 1.13 | 7 | 37.4 | 7 | 5–30 |
|
|