|
TI demands and obstacles | Specific analysis | Module design |
|
Wind-resistant design | High average wind speed and large wind angle of attack | TI module of canyon wind resistance |
Seismic design | Large seismic intensity near the fault | TI module of strong seismic resistance in the near field area |
Environmental design | Located in a highland ecological reserve | TI module of environmental protection |
Deep water construction | The Dadu river is over 10 meters deep and fast-flowing | TI module of deep water operation |
Anchor construction | The main cable force of a single anchor of tunnel anchor is up to 4.6 tons | TI module of the construction of large tunnel anchors |
Narrow construction site | Both banks of the mountain are exposed rock and steep | TI module of steep slope construction |
The site in the gorge is too narrow to lift stiffening beams from the valley floor | TI module of stiffened beam section lifting |
Integration of construction and maintenance | Harsh environment and difficult post-operation and maintenance | TI module of structural durability |
Difficulty in transporting materials | Weak infrastructure, large variety, and volume of material requirements | Modular management measures |
Large project size | Thousand-meter railway suspension bridge with a large span |
High level of risk management | Geological risk, construction safety risk, duration risk, environmental risk, and social risk |
|