Research Article
Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network
Table 1
Comparison of several construction methods.
| Comparison indicator | Cut-and-cover method [16] | Shield method [17] | Shallow burial and underground excavation method [18] |
| Geology | Various strata available | Various strata available | Water-bearing formations require special treatment | Place | Occupies more road area | Takes up less road area | Takes up less road area | Section change | Good adaptability | Poor adaptability | Good adaptability | Buried position | Shallow burial | Need some depth | Shallow burial | Waterproof construction | Easier | Easy | Difficult | Subsidence | Smaller | Smaller | Larger | Traffic obstacle | Greater impact | Less affected | Less affected | Underground pipeline | Demolition and protection required | No demolition and protection required | No demolition and protection required | Construction noise | Big | Small | Small | Surface demolition | Big | Small | Small | Water treatment | Precipitation, drying | Block and drop combination | Block, drop, or block-drain combination | Schedule | Affected by demolition and relocation, and the total construction period is relatively fast | The preliminary project is complex and the total construction period is average | Fast start and slow total construction period |
|
|