Research Article
Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network
Table 2
Surface subsidence during excavation of each part of Section 1.
| Distance from midline | Middle hole excavation settlement | Excavation settlement of left and right side holes | Total settlement | Middle cave settlement/total settlement | Side tunnel settlement/total settlement |
| −25.6 | 0 | −0.32 | −0.32 | 0.0 | 100.0 | −20.6 | −0.46 | −1.53 | −1.99 | 23.1 | 76.9 | −15.6 | −1.25 | −2.68 | −3.93 | 31.8 | 68.2 | −10.6 | −2.47 | −5.47 | −7.94 | 31.1 | 68.9 | −5.6 | −6.12 | −8.89 | −15.01 | 40.8 | 59.2 | −3.6 | −8.51 | −11.33 | −19.84 | 42.9 | 57.1 | −1.6 | −11.05 | −10.21 | −21.26 | 52.0 | 48.0 | 1.6 | −11.28 | −10.92 | −22.20 | 50.8 | 49.2 | 3.6 | −9.69 | −11.87 | −21.56 | 44.9 | 55.1 | 5.6 | −6.98 | −9.35 | −16.33 | 42.7 | 57.3 | 10.6 | −3.26 | −6.02 | −9.28 | 35.1 | 64.9 | 15.6 | −1.63 | −3.34 | −4.97 | 32.8 | 67.2 | 20.6 | −0.37 | −1.86 | −2.23 | 16.6 | 83.4 | 25.6 | 0 | −0.49 | −0.49 | 0.0 | 100.0 |
|
|