Research Article

Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network

Table 2

Surface subsidence during excavation of each part of Section 1.

Distance from midlineMiddle hole excavation settlementExcavation settlement of left and right side holesTotal settlementMiddle cave settlement/total settlementSide tunnel settlement/total settlement

−25.60−0.32−0.320.0100.0
−20.6−0.46−1.53−1.9923.176.9
−15.6−1.25−2.68−3.9331.868.2
−10.6−2.47−5.47−7.9431.168.9
−5.6−6.12−8.89−15.0140.859.2
−3.6−8.51−11.33−19.8442.957.1
−1.6−11.05−10.21−21.2652.048.0
1.6−11.28−10.92−22.2050.849.2
3.6−9.69−11.87−21.5644.955.1
5.6−6.98−9.35−16.3342.757.3
10.6−3.26−6.02−9.2835.164.9
15.6−1.63−3.34−4.9732.867.2
20.6−0.37−1.86−2.2316.683.4
25.60−0.49−0.490.0100.0