Research Article

Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network

Table 3

Surface subsidence during excavation of each part of Section 2.

Distance from midlineMiddle hole excavation settlementExcavation settlement of left and right side holesTotal settlementMiddle cave settlement/total settlementSide tunnel settlement/total settlement

−25.70−0.58−0.580.0100.0
−20.7−0.55−1.83−2.3823.176.9
−15.7−1.69−2.98−4.6736.263.8
−10.7−2.77−6.52−9.2929.870.2
−5.7−6.34−10.09−16.4338.661.4
−3.7−9.12−11.55−20.6744.155.9
−1.7−11.66−11.12−22.7851.248.8
1.7−12.39−11.46−23.8551.948.1
3.7−9.91−11.87−21.7845.554.5
5.7−6.78−10.64−17.4238.961.1
10.7−3.32−7.18−10.531.668.4
15.7−1.54−3.51−5.0530.569.5
20.7−0.73−1.99−2.7226.873.2
25.70−0.63−0.630100.0