Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network
Table 3
Surface subsidence during excavation of each part of Section 2.
| Distance from midline | Middle hole excavation settlement | Excavation settlement of left and right side holes | Total settlement | Middle cave settlement/total settlement | Side tunnel settlement/total settlement |
| −25.7 | 0 | −0.58 | −0.58 | 0.0 | 100.0 | −20.7 | −0.55 | −1.83 | −2.38 | 23.1 | 76.9 | −15.7 | −1.69 | −2.98 | −4.67 | 36.2 | 63.8 | −10.7 | −2.77 | −6.52 | −9.29 | 29.8 | 70.2 | −5.7 | −6.34 | −10.09 | −16.43 | 38.6 | 61.4 | −3.7 | −9.12 | −11.55 | −20.67 | 44.1 | 55.9 | −1.7 | −11.66 | −11.12 | −22.78 | 51.2 | 48.8 | 1.7 | −12.39 | −11.46 | −23.85 | 51.9 | 48.1 | 3.7 | −9.91 | −11.87 | −21.78 | 45.5 | 54.5 | 5.7 | −6.78 | −10.64 | −17.42 | 38.9 | 61.1 | 10.7 | −3.32 | −7.18 | −10.5 | 31.6 | 68.4 | 15.7 | −1.54 | −3.51 | −5.05 | 30.5 | 69.5 | 20.7 | −0.73 | −1.99 | −2.72 | 26.8 | 73.2 | 25.7 | 0 | −0.63 | −0.63 | 0 | 100.0 |
|
|