Analysis and Prediction of Subway Tunnel Surface Subsidence Based on Internet of Things Monitoring and BP Neural Network

Table 4

Surface settlement of each part of Section 3 during excavation.

Distance from midlineMiddle hole excavation settlementExcavation settlement of left and right side holesTotal settlementMiddle cave settlement/total settlementSide tunnel settlement/total settlement

−25.80−0.44−0.440.0100.0
−20.8−0.34−1.27−1.6121.178.9
−15.8−1.27−2.61−3.8832.767.3
−10.8−2.16−5.32−7.4828.971.1
−5.8−4.46−8.56−13.0234.365.7
−3.8−7.53−10.82−18.3541.059.0
−1.8−9.88−10.58−20.4648.351.7
1.8−10.35−10.26−20.6150.249.8
3.8−9.26−11.01−20.2745.754.3
5.8−5.12−10.64−15.7632.567.5
10.8−2.09−6.02−8.1125.874.2
15.8−0.94−3.11−4.0523.276.8
20.8−0.21−1.49−1.712.487.6
25.80−0.57−0.570100.0