Research Article
Design of Optimization Algorithm for Configuration of Amateur Sports Training Equipment in Smart City Community
Table 4
Total operating cost analysis table.
| | Coordinate | Construction cost (yuan) | Demand (person-time) | Wreck a cost (yuan) | Total operating cost (yuan) |
| | (200, 1500) | 30000 | 125 | 250 | 30250 | | (600, 800) | 30000 | 132 | 264 | 30264 | | (1500, 300) | 35000 | 128 | 256 | 35256 | | (2000, 1500) | 35000 | 112 | 224 | 35224 | | (600, 2000) | 40000 | 116 | 232 | 35232 | | (1000, 2500) | 40000 | 119 | 238 | 35238 | | (3000, 1500) | 25000 | 111 | 222 | 35222 | | (1500, 200) | 25000 | 135 | 270 | 35270 |
|
|