Complexity / 2017 / Article / Tab 2 / Research Article
An Approach to Integrating Tactical Decision-Making in Industrial Maintenance Balance Scorecards Using Principal Components Analysis and Machine Learning Table 2 Original attributes of the manufacturing report (production database).
ID_MACHINE Alpha numerical MONTH Numerical categorical NON_PLASTERED_PRODUCTION Numerical PLASTERED_PRODUCTION Numerical VOLUME_PLASTERED_PRODUCTION Numerical TOTAL_PRODUCTION Numerical WORKS_DAYS Numerical DAILY_PRODUCTION_TON Numerical CUTOUT_PRODUCTION Numerical DAILY_CUTOUT_PRODUCTION_TON Numerical DECREASE_MACHINE_% Numerical AVAILABLE_HOURS Numerical IDLE_TIME_EXTERNAL_CAUSES Numerical MAINTENANCE Numerical SCHEDULED Numerical BREAKS Numerical PRODUCTION_REST Numerical TOTAL_IDLE Numerical DAILY_IDLE_TIME Numerical OEE Numerical START_NUMBERS Numerical CUTOUT_TIME_CHANGES Numerical AVERAGE_PAPER_WEIGHTS Numerical AVERAGE_REAL_WIDTH Numerical AVERAGE_SPEED Numerical AVERAGE BUDGETED WIDTH Numerical WIDTH_DECREASE_CMS Numerical WIDTH_DECREASE_TON Numerical CAPE_PRODUCTION Numerical COST Numerical COST/TON Numerical INTERVENTIONS_NUMBER Numerical MEAN TIME BETWEEN FAILURES Numerical MEAN TIME TO REPAIR Numerical MEAN TIME TO FAILURE Numerical