Research Article
Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency
Figure 5
Score trajectories obtained by aggregation operators HA and InducedHA with different configuration of : (a) = 0, (b) = 0.3, (c) = 0.5, (d) = 0.7, (e) = 0.9, and (f) = 1.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |