Research Article
Distributed Control of a Manufacturing System with One-Dimensional Cellular Automata
Table 1
Operations of the AMS shown in Figure
1 and the resources involved.
| Resource | Activities | Resources requested to be available |
| Storage area | Hold raw parts and finished parts | Robot 1 | Robot 1 | Load and unload the conveyor | Conveyor and storage area | Robot 2 | Load and unload Buffer 1, Machine 1, and Machine 2 | Buffer 1, Machine 1, and Machine 2 | Robot 3 | Load and unload Buffer 2, Machine 3, and conveyor | Buffer 2, Machine 3, and conveyor | Machine 1 | Operation 1 | Robot 2 | Machine 2 | Operation 2 | Robot 2 | Machine 3 | Operation 3 | Robot 3 | Conveyor | Transport parts | Robot 1, Robot 2, and Robot 3 | Buffer 1 | Temporally hold parts | Robot 2 | Buffer 2 | Temporally hold parts | Robot 3 |
|
|