Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 11
Predicted water inflows and demands in each seasonal stage.
| | Candidate i | Stage (t = 1, 2, 3, 4) | Spring | Summer | Autumn | Winter |
| Water inflows (m3 × 107/h) | 1 | 1.4484 | 8.0021 | 2.7796 | 0.2017 | 2 | 0.6708 | 2.2816 | 0.8445 | 0.0982 | 3 | 0.6433 | 1.8019 | 0.8559 | 0.0975 | 4 | 0.3904 | 0.6698 | 0.3683 | 0.0971 | 5 | 0.8462 | 1.6252 | 0.7486 | 0.1729 |
| Water demands (m3 × 106/h) | 1 | 0.1871 | 0.2299 | 0.2196 | 0.1218 | 2 | 0.3420 | 0.4204 | 0.4016 | 0.2228 | 3 | 0.2071 | 0.2546 | 0.2432 | 0.1349 | 4 | 0.1865 | 0.2292 | 0.2189 | 0.1215 | 5 | 0.1321 | 0.1623 | 0.1551 | 0.0860 |
|
|