Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 13
Operational decisions under scenario 16.
| Candidate i | 1 | 2 | 3 | 4 | 5 |
| (m3 × 108/h) | 2.154 | 0.066 | 0.040 | 0.036 | 0.026 | (m3/h) | 115476 | 0 | 0 | 162013 | 111607 | (m3 × 108/h) | 4.690 | 6.714 | 8.496 | 9.246 | 11.014 | (m3 × 108) | 4.282 | 0 | 0 | 0.858 | 2.161 | (m3 × 108/h) | 4.691 | 6.714 | 8.496 | 9.248 | 11.015 |
|
|