Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 14
Operational decisions under scenario 1281.
| Candidate i | 1 | 2 | 3 | 4 | 5 |
| (m3 × 108/h) | 0.874 | 0.073 | 0.044 | 0.040 | 0.028 | (m3/h) | 115476 | 0 | 0 | 162013 | 111607 | (m3 × 108/h) | 5.171 | 6.936 | 8.496 | 9.219 | 10.847 | (m3 × 108) | 4.282 | 0 | 0 | 0.858 | 0.230 | (m3 × 108/h) | 5.172 | 6.936 | 8.496 | 9.221 | 10.848 |
|
|