Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 15

Corresponding cost terms and benefit.

Operational stagesCandidate iTotal performance (RMB × 108)Operational cost (RMB × 108)Penalty cost (RMB × 108)Power generation (RMB × 108)

T = 401471.3960.06377.453550.002
4808.1650.0170808.401
5566.4100.0530567.013
Total1845.9710.13477.4531925.416

T = 801236.3580.063312.491550.002
4808.1650.0170808.401
5566.4100.0530567.013
Total1610.9330.134312.4911925.416

T = 1201205.6040.063343.245550.002
4808.1650.0170808.401
5566.4100.0530567.013
Total1580.1790.134343.2451925.416

T = 1601201.6530.063347.196550.002
4808.1650.0170808.401
5566.4100.0530567.013
Total1576.2280.134347.1961925.416

T = 2001201.1500.063347.699550.002
4808.1650.0170808.401
5566.4100.0530567.013
Total1575.7250.134347.6991925.416