Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
| Types of variables | Symbol | Description |
| The planning stage | xi | 1 if hydropower station i is chosen, 0 otherwise | Capi | The maximum capacity of hydropower station candidate i |
| The operational stages | | Water storage of candidate i at stage t under scenario s (m3) | | Loss flow of candidate i at stage t under scenario s (m3/h) | | Water discharge to downstream in candidate i at stage t under scenario s (m3/h) | | Water discharge of power generation in candidate i at stage t under scenario s (m3/h) | | Water spill in candidate i at stage t under scenario s (m3/h) |
|
|