Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 3
Related parameters of hydropower station candidates.
| Candidate i | Ki (kg/(m2·s2)) | Nimin (KW) | Nimax (KW) | Hi (m) | ci (RMB/m3) | ri (RMB/(m3·year)) | Qimax (m3 × 108/h) |
| 1 | 8.4 | 2546250 | 5092500 | 105 | 0.1 | 0.06 | 0.4676 | 2 | 8.4 | 1506750 | 3013500 | 93 | 0.125 | 0.072 | 0.8550 | 3 | 8.4 | 1500000 | 3000000 | 90 | 0.15 | 0.05 | 0.5177 | 4 | 8.4 | 3742500 | 7485000 | 110 | 0.175 | 0.08 | 0.4662 | 5 | 8.4 | 2625000 | 5250000 | 112 | 0.2 | 0.1 | 0.3301 |
|
|