Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 3

Related parameters of hydropower station candidates.

Candidate iKi (kg/(m2·s2))Nimin (KW)Nimax (KW)Hi (m)ci (RMB/m3)ri (RMB/(m3·year))Qimax (m3 × 108/h)

18.4254625050925001050.10.060.4676
28.415067503013500930.1250.0720.8550
38.415000003000000900.150.050.5177
48.4374250074850001100.1750.080.4662
58.4262500052500001120.20.10.3301