Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 4

Minimum storage and limitation of water flows of hydropower station candidates.

Candidate iVimin (m3 × 108)QFimin (m3 × 108/h)QFimax (m3 × 108/h)

10.03110.06481.5732
20.02130.04681.7928
30.01310.04320.4248
40.04200.16203.5568
50.01150.03960.6912