Research Article
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 5
Random water inflows in each seasonal stage of each hydropower station candidate.
| Candidate i | Inflows level | Water inflows (m3 × 107/h) | Spring | Summer | Autumn | Winter |
| 1 | H | 1.2846 | 5.7276 | 2.2020 | 0.2031 | L | 0.9867 | 4.3995 | 1.6914 | 0.1560 | 2 | H | 0.5932 | 1.6312 | 0.6677 | 0.0985 | L | 0.4589 | 1.2617 | 0.5165 | 0.0762 | 3 | H | 0.5653 | 1.2849 | 0.6739 | 0.0969 | L | 0.4441 | 1.0093 | 0.5294 | 0.0762 | 4 | H | 0.3645 | 0.5958 | 0.3356 | 0.0930 | L | 0.2575 | 0.4209 | 0.2371 | 0.0657 | 5 | H | 0.6900 | 1.1642 | 0.5710 | 0.1515 | L | 0.6482 | 1.0936 | 0.5363 | 0.1423 | Probability | H | 0.4 | 0.7 | 0.55 | 0.25 | L | 0.6 | 0.3 | 0.45 | 0.75 |
|
|