Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 5

Random water inflows in each seasonal stage of each hydropower station candidate.

Candidate iInflows levelWater inflows (m3 × 107/h)
SpringSummerAutumnWinter

1H1.28465.72762.20200.2031
L0.98674.39951.69140.1560
2H0.59321.63120.66770.0985
L0.45891.26170.51650.0762
3H0.56531.28490.67390.0969
L0.44411.00930.52940.0762
4H0.36450.59580.33560.0930
L0.25750.42090.23710.0657
5H0.69001.16420.57100.1515
L0.64821.09360.53630.1423
ProbabilityH0.40.70.550.25
L0.60.30.450.75