Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 7

Predicted water demands in each seasonal stage.

Candidate iStage (t = 1, 2, 3, 4)
SpringSummerAutumnWinter

Water demands (m3 × 106/h)10.18710.22990.21960.1218
20.34200.42040.40160.2228
30.20710.25460.24320.1349
40.18650.22920.21890.1215
50.13210.16230.15510.0860