Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 8
Estimation gaps of the DE model.
| Discount factor δ | Planning stages | T = 4 | T = 8 | T = 12 |
| 0.99 | 25.53% | 22.51% | 19.94% | 0.95 | 17.89% | 6.71% | −2.99% | 0.90 | 8.72% | −9.76% | −24.32% | 0.85 | −0.51% | −23.20% | −39.73% | 0.80 | −9.16% | −34.34% | −50.97% | 0.75 | −17.29% | −43.92% | −59.59% | 0.70 | −24.72% | −51.99% | −66.37% | 0.65 | −31.44% | −58.62% | −71.61% | 0.60 | −37.53% | −64.02% | −75.64% |
|
|