General attribute | Basic attribute | Risk consequence | Risk grade | Risk weight | Risk value |
|
Key attribute | Cut slope height | Slide slump, blocks peeling off, roadbed deformation | FG1 | 0.2 | 2 |
Bank slope height | Embankment settlement, slope collapse | FG3 | 0.1 | 9 |
Special construction conditions | Casualty, economic loss, postproject risks | FG2 | 0.2 | 6 |
Special construction technologies | Project failure, economic loss, derivative project failure, postproject risks | FG1 | 0.2 | 1 |
Deep foundation pit | Structural design failure, settlement deformation, unexpected accidents | FG2 | 0.2 | 7 |
Existing railway effects | Technological bottleneck, roadbed deterioration, schedule delay | FG4 | 0.1 | 16 |
|
Secondary attribute | Project schedule | Go over budget, alleviate function, interface project delay | FG4 | 0.1 | 15 |
Function loss | Below the market demand | FG3 | 0.05 | 9 |
Project investment | Project abandon, poor quality, social conflicts | FG4 | 0.1 | 11 |
Environment protect | Destroy environment like cultural relics and natural habitats. Social conflict and welfare | FG1 | 0.15 | 1 |
Social status along the project | Social conflict, go over budget, schedule delay | FG5 | 0.05 | 17 |
Locomotive depot configuration | Operational risk, social investigation | FG4 | 0.05 | 14 |
Vehicle configuration | Operational risk | FG5 | 0.05 | 18 |
Terminal location | Project abandon, infrastructure settlement | FG3 | 0.05 | 14 |
Project interface | Project isolation, project failure | FG3 | 0.2 | 9 |
Infrastructure relocation | Go over budget, schedule delay, group conflict | FG2 | 0.15 | 6 |
Residual risk | Unexpected loss | FG3 | 0.05 | ā |
|
Environmental attribute | Weather condition | Project duration, operational risk | FG3 | 0.15 | 9 |
Underground water | Settlement, roadbed deformation, water pollution | FG5 | 0.25 | 18 |
Geological condition | Roadbed risk, social conflict, project abandon, karst water and mud inrush disaster, bombing | FG3 | 0.25 | 7 |
Stuff quality | Casualty, operational risk, project failure | FG2 | 0.35 | 3 |
|