Research Article

Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park

Table 10

Second-level fuzzy evaluation index and evaluation coefficient.

key production linkskey parametersevaluation labelingevaluation coefficient

Air precooling systemCirculation water level880

Air separation tower system (contain Distillation column)Liquid air level in lower column1110
Distillation column pressure1050
Liquid oxygen level in the main condenser1010
Distillation column top temperature1040

Air purification systemAdsorption barrel temperature890
Adsorption barrel pressure870