Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park

Table 2


itemDescription

PI101Air intake chamber pressure (MPa)
PI102Nitrogen Outlet Tower Pressure (MPa)
PI103Oxygen-enriched air outlet pressure (MPa)
PI1201Air outlet left adsorption bucket pressure (MPa)
PI1202Air outlet right adsorption barrel pressure(MPa)
PI1203Instrument air pressure (MPa)
PI01Pressure of air outlet main heat exchanger(MPa)
PI02Lower column pressure (MPa)
PI03Evaporator condenser pressure (MPa)
PDI01The resistance of lower column (MPa)
PI401Turboexpander1# Intake pressure (MPa)
PI402Turboexpander1#Exhaust pressure (MPa)
PI403Turboexpander2#Intake pressure (MPa)
PI404Turboexpander2#Exhaust pressure (MPa)
PI2001Turboexpander1#Bearing air pressure (MPa)
PI2002Turboexpander2# Bearing air pressure (MPa)
PI2003Turboexpander1#Sealing pressure (MPa)
PI2004Turboexpander2#Sealing pressure (MPa)
TI101Air temperature before entering tower (°C)
TI102Outlet Tower Temperature of Contaminated Nitrogen (°C)
TI103Outlet Tower Temperature of Contaminated Nitrogen (°C)
TI1201Air outlet left adsorption bucket temperature (°C)
TI1202Air outlet right adsorption bucket temperature (°C)
TE1204Temperature of regenerated gas outlet adsorption bucket (°C)
TI01Temperature of main air outlet heat exchanger (°C)
TI02Turboexpander1# Intake temperature (°C)
TI03Turboexpander2# Intake temperature (°C)
TI04Turboexpander1# Exhaust temperature (°C)
TI05Turboexpander2# Exhaust temperature (°C)
TI07Exit temperature of precooler (°C)
FI1201Regenerative gas flow rate (Nm3/h)
FI101Air flow rate (Nm3/h)
FI102Nitrogen flow rate (Nm3/h)
LI101liquid air level in lower column (mm)
LI01Water cooled liquid level (mm)
LI02Liquid oxygen level in the main condenser (mm)
SI402Expander speed (RPM)
LV02Liquid-air throttle valve (%)