Research Article
Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park
Table 9
Performance evaluation of different prediction models.
| Method | ME | MAE | RMSE | MAPE (%) | TIME (s) |
| BP | 74.641 | 9.982 | 129.060 | 1.023% | 337.414 | ELM | 70.414 | 7.916 | 99.137 | 0.793% | 0.77 | Dynamic Recurrent | 49.381 | 5.768 | 69.117 | 0.577% | 40.341 | Proposed Method | 31.360 | 4.879 | 55.958 | 0.498% | 34.732 |
|
|