Research Article
Risk Evaluation of Sewage Treatment PPPABS Projects Using Combination Weight Method and D-S Evidence Theory
Table 4
Risk evaluation criteria.
| | Risk level | Corresponding risk value range |
| | Very high () | [0.8, 1.0] | | High () | [0.6, 0.8) | | Moderate () | [0.4, 0.6) | | Low () | [0.2, 0.4) | | Very low () | [0, 0.2) |
|
|