Research Article

An Efficient and Cost-Effective Power Scheduling in Zero-Emission Ferry Ships

Table 4

Total costs and emission factors for rule-based method.

Case typeUnder-sail cost ($)At-anchor cost ($)Total cost ($)CO2 (kg)NOx (kg)SOx (kg)

Proposed method426.48669.530496.016000
Rule-based438.65572.309510.964000