Research Article
An Efficient and Cost-Effective Power Scheduling in Zero-Emission Ferry Ships
Table 4
Total costs and emission factors for rule-based method.
| Case type | Under-sail cost ($) | At-anchor cost ($) | Total cost ($) | CO2 (kg) | NOx (kg) | SOx (kg) |
| Proposed method | 426.486 | 69.530 | 496.016 | 0 | 0 | 0 | Rule-based | 438.655 | 72.309 | 510.964 | 0 | 0 | 0 |
|
|