Research Article
Operational Safety Risk Assessment for the Water Channels of the South-to-North Water Diversion Project Based on TODIM-FMEA
Table 1
The failure modes of the water channels in the MRP during the operation stage.
| Serial number | Failure mode | Main causes of the failure | Effects of the failure |
| FM1 | Structural cracks | Temperature change, shrinkage, freezing, uneven settling of the foundation, etc. | Reduce the durability of the structure, weaken its bearing capacity, and can cause failure and destruction of the structures | FM2 | Poor water delivery during ice periods | Ice blocks the water delivery | Water overflows and damage to channel embankments | FM3 | Instability of the channel slope | Sudden change of water level; reduction of the antislide stability of the foundation | Causes overtopping and regional floods around the water diversion system | FM4 | Material aging | Carbonization of concrete, temperature change, and freeze-thaw damage | Leakage | FM5 | Abnormal leakage | Microcracks and biological destruction | The collapse of the bank slope, which affects the safety of the structures | FM6 | Foundation defects | Expansive (rock) soils, loess soil, saturated sand sections, and filled sections | Loss of bearing capacity of the foundation and collapse of structures |
|
|
Note. FM: failure mode.
|