Research Article

Operational Safety Risk Assessment for the Water Channels of the South-to-North Water Diversion Project Based on TODIM-FMEA

Table 5

Relative dominance matrix of different failure modes of risk factors.

ΦSΦOΦD
Failure modesFM1FM2FM3FM4FM5FM6FM1FM2FM3FM4FM5FM6FM1FM2FM3FM4FM5FM6

FM10−0.2433−0.35650.0325−0.7958−0.317800.11340.11210.00790.08220.10120−0.0347−0.7521−0.7853−1.0835−0.9296
FM20.02610−0.14090.0586−0.0839−0.0745−0.907100.0061−0.8468−0.2809−0.11300.00350−0.7202−0.7513−1.0589−0.1634
FM30.03830.015100.07380.00610.0071−0.8974−0.04870−0.8340−0.2839−0.11180.07640.07320−0.0350−0.3482−0.1848
FM4−0.3025−0.5457−0.68660−0.6297−0.6203−0.06340.10580.104200.07430.09330.07980.07630.00360−0.3267−0.1634
FM50.08550.0090−0.05700.067600.0010−0.65760.03510.0355−0.594200.02150.11010.10760.03540.033200.0166
FM60.03410.0080−0.06640.0666−0.00940−0.81010.01410.0140−0.7467−0.172100.09450.01660.01880.0166−0.16340

Note. FM: failure mode.