Research Article
Analysis of the Influence of Renewable Generator Frequency Endurance Capability on Low-Frequency Load Shedding: A Hunan Case Study
Table 5
Low-frequency load shedding scheme of Hunan power grid.
| Proportion of the distributed photovoltaic generation without frequency endurance capability (%) | Rounds of load that is cut off | Minimum frequency | Percentage of load cutoff |
| 0 | 2 | 48.72 | 13.17 | 5 | 2 | 48.72 | 13.17 | 25 | 2 | 48.64 | 13.17 | 50 | 3 | 48.52 | 19.74 |
|
|