Economic Feasibility Analysis of PVAC and TAC of Three Typical Application Cases in China

Table 12

LCC of PVAC operating on the mode of shifting peak electricity load for the grid.

Item ($)Case 1Case 2

Cost of surplus electricity−607.8−455.8
Cost of selling electricity−666.0666.0
Cost of consuming electricity59.62134.3
LCC3794.34165.8