Research Article
A Double-Layer Combination Algorithm for Real-Time Information-Sharing Network Design Problem
Table 4
Manufacturers and potential suppliers.
| ā | Fuzhou (n1) | Sanming (n2) | Jinhua (n3) | Hefei (n4) | Nanjing (n5) | Nanping (n6) |
| ā | a | b | c | a | b | c | a | b | c | a | b | c | a | b | c | a | b | c |
| Guangzhou (m1) | 228 | 3.1 | 0.1 | 68 | 3.1 | 0.07 | 308 | 3.2 | 0.08 | 582 | 3.2 | 0.08 | 596 | 3.3 | 0.07 | 20 | 3 | 0.08 | Zhengzhou (m2) | 18 | 3.0 | 0.04 | 224 | 3.1 | 0.1 | 343 | 3.2 | 0.07 | 440 | 3.3 | 0.07 | 518 | 3.2 | 0.04 | 230 | 3.1 | 0.1 | Anqing (m3) | 294 | 3.3 | 0.07 | 480 | 3.2 | 0.08 | 300 | 3.1 | 0.04 | 145 | 3 | 0.07 | 238 | 3.1 | 0.04 | 440 | 3.3 | 0.1 |
|
|