Research Article
An Optimal DoS Attack Strategy Disturbing the Distributed Economic Dispatch of Microgrid
Figure 5
EDP with disconnected topology under DoS attacks. (a) The power output of each generator. (b) The incremental cost of each generator. (c) Auxiliary variable y of each generator. (d) Total power output and load demand.
| (a) |
| (b) |
| (c) |
| (d) |