An Improved Integrated Scheduling Algorithm with Process Sequence Time-Selective Strategy

Figure 4

Gantt chart of each trial scheduling scheme of process A6. (a) The scheduling scheme is obtained by trial scheduling at quasi-scheduling time point “1.” (b) The scheduling scheme is obtained by trial scheduling at quasi-scheduling time point “4.” (c) The scheduling scheme is obtained by trial scheduling at quasi-scheduling time point “21.”