Research Article
Theory and Realization of Secondary Task Assignment for Multi-UAV Pickup Based on Green Scheduling
Table 8
The average of the results of the two algorithms.
| | | | | | | Distance (km) | Time (min) | Distance (km) | Time (km) | Distance (min) | Time (km) | Distance (km) | Time (min) | Distance (km) | Time (km) |
| Local | 12.1281 | 6.5031 | 24.0385 | 12.8648 | 36.3274 | 19.6593 | 46.8312 | 25.5667 | 62.3682 | 34.0831 | Global | 12.0771 | 6.5364 | 23.9490 | 12.9662 | 36.1841 | 19.8004 | 46.6705 | 25.7123 | 62.1633 | 34.2576 |
|
|