Research Article
Social Stability Risk Diffusion of Large Complex Engineering Projects Based on an Improved SIR Model: A Simulation Research on Complex Networks
Figure 10
The simulation results of the IMSR model when the risk dormancy rate takes different values: (a) the simulation result when = 0.2; (b) the simulation result when = 0.3; (c) the simulation result when = 0.4.
| (a) |
| (b) |
| (c) |