Research Article

BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects- (CPEC-) Quantitative Approach

Table 3

Correlation analysis between BIM, planning, and scheduling.

Correlation analysis

BIMPlanningScheduling

Pearson correlation10.5130.353
BIM
Sig. (2-tailed)0.00010.0001
N210210210

Pearson correlation0.51310.286
BIM
Sig. (2-tailed)0.00010.00010.0001
N210210210

Pearson correlation0.3530.2861
BIM
Sig. (2-tailed)0.00010.0001
N210210210

Correlation is significant at the 0.01 level (2-tailed).