Research Article
BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects- (CPEC-) Quantitative Approach
Table 3
Correlation analysis between BIM, planning, and scheduling.
| | Correlation analysis |
| | | BIM | Planning | Scheduling |
| | Pearson correlation | 1 | 0.513 | 0.353 | | BIM | | | | | Sig. (2-tailed) | | 0.0001 | 0.0001 | | N | 210 | 210 | 210 |
| | Pearson correlation | 0.513 | 1 | 0.286 | | BIM | | | | | Sig. (2-tailed) | 0.0001 | 0.0001 | 0.0001 | | N | 210 | 210 | 210 |
| | Pearson correlation | 0.353 | 0.286 | 1 | | BIM | | | | | Sig. (2-tailed) | 0.0001 | 0.0001 | | | N | 210 | 210 | 210 |
|
|
Correlation is significant at the 0.01 level (2-tailed). |