Research Article

Optimal Setting Method of Inverse Time Overcurrent Protection for the Distribution Networks Based on the Improved Grey Wolf Optimization

Table 7

Results of heuristic parameter adjustment when a two-phase short circuit occurs.

Population sizeMaximum number of iterationsMinimum total action time (s)Average total action time (s)Standard deviation of the total action time

10100023.11826.6827.091
20100023.56125.7804.219
30100022.97723.5610.762
40100023.20124.9753.803
50100023.37924.6833.625