Research Article

Optimal Setting Method of Inverse Time Overcurrent Protection for the Distribution Networks Based on the Improved Grey Wolf Optimization

Table 8

Protection action results of the two-phase short circuit under different time differential.

CTI (s)Total action time (s)

0.422.381
0.4522.739
0.523.162
0.5524.073
0.624.833
0.6525.690
0.727.196