Corrigendum
Corrigendum to “A Novel MILP Model for the Production, Lot Sizing, and Scheduling of Automotive Plastic Components on Parallel Flexible Injection Machines with Setup Common Operators”
Table 7
Small dataset results of the base LSSP MILP: scheduling.
|